Project: KWUP Balance Of Plant Engineering & Design
Project Description
The Kwinana plant will use cutting-edge cement production technology projects to produce a lower-carbon footprint product than the existing operations. Edanbrook contributes to the project by working on the steel detailing (3D-Modelling). The initiative also seeks to optimize the clinker material handling process and, once fully operational, to reduce heavy vehicle movements in the company's WA operations.
Scope of work
- Detail Engineering.
- As Built.

